I’m going to give this challenge a try. I’m planning on doing the silver level (10 models for the month) in LightWave 9.6.
First model is Etch-A-Sketch in the Toys category.
Time spent: 2 hr. 35 min. (modeling, not including rendering and setup).
Note: I used a LW plugin called “Polygon Coloring” for the wireframe renders. For some reason, not all of the lines are showing up on the Etch-A-Sketch.