Dynamic Spline Constraint issue.

Become a member of the CGSociety

Connect, Share, and Learn with our Large Growing CG Art Community. It's Free!

 
Thread Tools Search this Thread Display Modes
  11 November 2017
Dynamic Spline Constraint issue.

Hi people, would like to know how to avoid the gap between the constrained point in the dynamic spline and the animated object where is attached.
Thanks in advance.

__________________
 
  11 November 2017
The pivot of the object and the spline point you linked with have to match their positions in space.
 
  11 November 2017
This always drives me crazy. The solution is setting the priority of the Spline Dynamics Tag to Animation with a value of 499 (maximum possible value). Hope that helps. Also,try placing the Spline at the bottom of the Object Manager so it gets read first.
M.
 
  11 November 2017
Just to pick up on Nanome's point - yes, move the spline below the sphere/torus bauble, but not because it then gets processed first. The processing order is from the top down in the Object manager, so the bauble needs to be calculated first then the spline for the 'string' can be calculated. If the position in the Object manager can't be changed, then increase the priority order of the 'string' spline to a number above the bauble's priority. Or change the constrained point's priority (in the tag) from Expression to Animation.
One of those should fix things!
 
  4 Weeks Ago
Thanks for the correction, Pete. I meant at the bottom so it gets read after all the other calculations.
 
reply share thread



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
CGSociety
Society of Digital Artists
www.cgsociety.org

Powered by vBulletin
Copyright 2000 - 2006,
Jelsoft Enterprises Ltd.
Minimize Ads
Forum Jump
Miscellaneous

All times are GMT. The time now is 02:35 AM.


Powered by vBulletin
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.