whom
12-27-2010, 05:18 PM
- The speed modelling challenges are open to everybody.
- In every challenge you will get a list of items. Pick one and try to model it as fast as possible. If you want, you can do all of them.
- Do not exceed the time limit of the challenge. If you're out of time and still haven't finished, post the unfinished model.
- If you finish before the time limit, spend the remaining time on refining and adding details to your model.
- Focus on modelling. Shading, lightning and "proper" rendering are optional (and thus not limited by time).
- Take as much time for reference hunting as you need.
- When posting your model make sure you post a wireframe of your model. (try to do more then one view of the model).
- You can do any challenge you want. The challenges are not closed when the SMC passes. If you fancy an older challenge, do that.
- For the concept items you have to create your own designs. If possible post the design images as well.
SMC 56 (12.27.2010 - 01.12.2011)
-Items (3h time limit)-
Building
Guitar
Ice Skates
Rose
Door
Stairs
Kitchen table with Chairs
Stove
Dices
Elephant
Barrels
spider
Boots
Bat
The Moon (Rather not just a texture lol)
..
- In every challenge you will get a list of items. Pick one and try to model it as fast as possible. If you want, you can do all of them.
- Do not exceed the time limit of the challenge. If you're out of time and still haven't finished, post the unfinished model.
- If you finish before the time limit, spend the remaining time on refining and adding details to your model.
- Focus on modelling. Shading, lightning and "proper" rendering are optional (and thus not limited by time).
- Take as much time for reference hunting as you need.
- When posting your model make sure you post a wireframe of your model. (try to do more then one view of the model).
- You can do any challenge you want. The challenges are not closed when the SMC passes. If you fancy an older challenge, do that.
- For the concept items you have to create your own designs. If possible post the design images as well.
SMC 56 (12.27.2010 - 01.12.2011)
-Items (3h time limit)-
Building
Guitar
Ice Skates
Rose
Door
Stairs
Kitchen table with Chairs
Stove
Dices
Elephant
Barrels
spider
Boots
Bat
The Moon (Rather not just a texture lol)
..
