Gloor
09-30-2007, 04:46 PM
Hi,
I have 2 animations. One was done in 24FPS and the other one in 25FPS. If I set one to the value of the other then the timing will be off and I would have to retime it again. SO, I was wondering if I render them out and then make 2 video clips (one 24FPS the other 25FPS) can I then take to programs like Premier Pro or similar and make a single video clip with lets say 24FPS and not to break the timing for the one that was rendered and exported as 25FPS? Or is there another way I could blend two animations together and not mess up the timing? Thanks in advance
I have 2 animations. One was done in 24FPS and the other one in 25FPS. If I set one to the value of the other then the timing will be off and I would have to retime it again. SO, I was wondering if I render them out and then make 2 video clips (one 24FPS the other 25FPS) can I then take to programs like Premier Pro or similar and make a single video clip with lets say 24FPS and not to break the timing for the one that was rendered and exported as 25FPS? Or is there another way I could blend two animations together and not mess up the timing? Thanks in advance
